EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
DaveBellairs
- Entry
Date:
Feb 01, 2024
Hours:
2
Stick grips
Category: Avionics
Description:
Pulled out the right stick grip and labeled the wires per the instructions. Added an additional tie down for the ELT wires. Removed the electric boost pump to determine a path for the pitot and static lines.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.